About Pharaoh Boxing
Pharaoh Boxing is a boxing training facility located within the So Ill Syndicate Gym in Carbondale, IL. The club offers a wide range of structured programs designed for boxers of all levels—from beginners to advanced athletes. Emphasizing technical proficiency, safety, and performance development, the curriculum is built on proven training methods and modern fitness principles. Certified coaches with extensive experience in the sport provide clear guidance and structured instruction, ensuring that each session meets high standards of excellence.
Dedicated to advancing the art and discipline of boxing, Pharaoh Boxing continuously evolves its training environment and resources. The facility is equipped with state-of-the-art gear and is actively expanding its space to accommodate the growing needs of the local boxing community. In addition to regular classes, the club hosts events and workshops that contribute to the athletic and professional development of its participants.
Location at So Ill Syndicate Gym: 215 S Illinois Ave, Carbondale, Illinois
Head Coach, Willy Martinez
Inside the Ring
Williams Martinez, or just “Martinez” as he prefers, was first introduced to boxing in 8th grade when his older cousin used to take him to the local boxing club. Martinez only visited the club for a couple months, but it was enough to spark a flame that would continue to grow.
Once Martinez got his license at the age of 16, in that same month he began to drive himself to the Villa Park Boxing Club in Northern Illinois. Since then, Martinez has been either a student of the sport, an avid fan, or a competitor for the past 25 years.
Since first stepping into a boxing club in 8th grade, he has spent hundreds of hours learning and training with former and current Olympians, Chicago Golden Glove fighters, Martial artists and Professional fighters. He has trained at multiple gyms between the Chicagoland area and Southern Illinois which have given him a wide range of styles and cultures.
Having trained with so many gyms/fighters gave him the opportunity to learn about strategy, strength and conditioning exercises and how to listen to a fighter’s individual concerns. He is also a Father to two girls, so he understands the importance of nurturing and developing the youth.
Elite Training. Accessible to All.
Opportunity shouldn’t have a geographic limit. As the only USA Boxing certified gym in a 60-mile radius, Pharaoh Boxing provides world-class instruction without the commercial price tag. By becoming a sponsor, you are directly outfitting athletes, funding competition travel, and building champions in Southern Illinois. Partner with us to keep the barrier to entry low and the standard of excellence high. (Pharaoh Boxing Club is a registered 501c3 organization).